Construction logistics in Westminster
Logistics and traffic management drawing support for Westminster SEMP and CMP submissions, with access, deliveries and public routes considered together.
Discuss your projectStart with the council requirement
Westminster's revised Code of Construction Practice applies to new CMP/SEMP applications from 1 June 2026 and existing active sites from 1 September 2026. The council says existing approved SEMPs or CMPs do not automatically require amendment. Check the project condition and the council's applicable checklist.
Access and loading
The logistics review should address vehicle sizes, loading positions, turning space and the relationship with busy footways, cycle routes, buses and surrounding servicing. Drawings can help assess temporary loading arrangements and the space left for other road users.
Deliveries and sensitive neighbours
Develop the delivery sequence around available loading space and known restrictions. Consider booking and call-forward controls, loading duration, schools and surrounding businesses, with contingency arrangements when the site cannot receive a vehicle.
CLC's contribution
We prepare the agreed logistics and traffic management elements for coordination into the wider SEMP or CMP. These can include routing, tracking, loading, site layouts, phasing and pedestrian-interface drawings. The wider environmental submission remains coordinated by the appointed project team.
Before submission
Confirm project-specific working and delivery periods, checklist requirements and any separate highway permissions. Logistics drawings do not authorise highway occupation or works. Send the condition, drawings and available construction information for a defined scope and fee.
Official guidance
Westminster: Code of Construction Practice documentsSources checked 5 September 2026. Confirm current guidance and project-specific requirements before submission.
Let’s review your project requirements.
Send your site location, available drawings and planning condition or project brief. We’ll confirm the proposed scope, fee and timeframe.
Discuss your project